1. Description of Tasks
2. Procedures
3. Documents
================================================
The proposal should include a time line of the Supply activities.
Technical assistance during Pre-Erection of the telescope at the "to be determined" factory location or during final installation on Mt. Graham is not included in this Statement of Work. The LBTC reserves the right to negotiate for such services at a later time.
1.2 Deliverable Hardware
Listed in the table below are all the hardware components to be
delivered as part of this Statement of Work.
Line Item |
Quantity for Delivery |
Drawing CAN # |
Description of Hardware Item |
---|---|---|---|
1 | 1 | 421e042 | Central Bearing Support (Upper and Lower) |
2 | 2 | 430e008 | Lateral Frame Structure |
3 | 1 | 430e012 | Central Frame Structure |
4 | 4 | 430e013 | Lateral Pad Supports |
5 | TBD | 430e007 | Bolts and Fasteners |
Fasteners should be delivered with an excess over the required number. The excess should be 2% of the required number with a minimum of four fasteners for each size and length.
1.3 Deliverable Documents
Described in this section are all the manuals, plans, drawings and
documentation that must be supplied as part of this Statement of Work.
All documents shall be supplied in four (4) hard copies and one (1)
digital copy.
Documentation packages, shall be supplied in support of the following functional activities:
The test and inspections shall include:
1.3.2.1 Test Procedures
The Test Procedures shall describe in detail all the necessary operations to perform verification through a test. A Test Procedure shall be produced for every verification test required and shall contain the following information:
1.3.2.2 Test Reports
The Test Reports shall summarize the findings of the tests. The Test Report shall be submitted to the LBTC not later than 30 days after the test. A Test Report shall contain the following information:
All the workshop drawings must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.
1.3.3.2 As-Built Drawings
The LBTPO shall receive copies of the updated "as-built" drawings and documentation not later than 30 days after the completion of the acceptance tests, and at least 15 days prior to acceptance (see below).
2.2 Technical Liaison
The Supplier shall provide access to all phases of the Work to the
following LBTC Technical Representative(s):
Gianpietro Marchiori European Industrial Engineering Via Torino #65 D/E 30170 Mestre (VE) ITALY telephone: 39-41-531-7906 telefax: 39-41-531-7757 email: eiedir@ve.nettuno.it
The Supplier shall maintain informal technical liaison with the LBT Project Technical Representative(s). These representative(s) shall be provided the following:
All workshop drawings, parts lists and manufacturing plans must be submitted to the LBTC Technical Representative for approval before purchasing any materials and/or beginning any construction.
LBTC approval will cover only the functional and conceptual aspects of the design and will not cover the correctness of the dimensions and practicality of the machining. Approval of the drawings shall not indicate acceptance of the Work.
2.3 Technical Changes
All ECRs, NCRs, and Requests for Waivers or Deviations will be presented to the Technical
Representative(s) for further evaluation, formulation of responses, and recommendations to the LBT
Director.
2.3.1 Engineering Change Request
In the event that the Supplier deems it necessary to deviate from any specification or term of the Technical Specifications or the Proposal, the Supplier shall deliver to the Technical Representative(s) an Engineering Change Request (ECR) setting forth:
2.3.2 Non-Conformance Report (NCR)
The Supplier shall report all non-conformities from the Technical Specifications which occur during the manufacture, assembly, or testing at all levels of the Work. Each Non-Conformance-Report shall set forth the following:
2.3.3 Request for Waiver/Deviation
A Request for Waiver may be issued during the manufacturing, test or integration of a deliverable item to:
A granted waiver does not lead to changes of any approved and released documents. The Request for Waiver shall include:
It shall be accompanied by all documentation required by the LBT Corporation to judge the acceptability of the waiver. If any change in the schedule or performance are expected, these points shall be clearly addressed.
2.4 Point of Delivery
All documents shipped as a result of this Statement of Work shall be
sent to the LBT Project Office:
LBT Project Office/USA The University of Arizona Steward Observatory Tucson, AZ 85721-0065 USA
The arrangements for packing and delivery of hardware will be communicated to the Supplier through a letter from the LBTPO.
Document Type | Drawing CAN # |
Revision Date | Assembly / Part Name |
---|---|---|---|
Technical Specification | 401e026d.doc 401e026d.htm | 04 Aug 1997 | Azimuth Frame Structure and Central Bearing Support |
Autocad Drawing | 421e037b.dwg | 02 Jun 1997 | Pier Construction Drawings Pier Upper Ring General Assembly |
Autocad Drawing | 421e042c.dwg | 16 Jun 1997 | Pier Construction Drawings Pier Upper Ring Central Bearing Support Assembly |
Autocad Drawing | 421e043b.dwg | 02 Jun 1997 | Pier Construction Drawings Pier Upper Ring Lower Bearing Support |
Autocad Drawing | 421e044b.dwg | 02 Jun 1997 | Pier Construction Drawings Pier Upper Ring Upper Bearing Support |
Autocad Drawing | 430e007c.dwg | 15 Jul 1997 | Azimuth Platform Structure Frame Structure General Assembly |
Autocad Drawing | 430e008b.dwg | 02 Jun 1997 | Azimuth Platform Structure Lateral Frame Structure General Assembly |
Autocad Drawing | 430e009b.dwg | 02 Jun 1997 | Azimuth Platform Structure Lateral Frame Structure Sect. A-A; B-B; H-H |
Autocad Drawing | 430e010b.dwg | 02 Jun 1997 | Azimuth Platform Structure Lateral Frame Structure Sect. C-C; D-D; L-L |
Autocad Drawing | 430e011b.dwg | 02 Jun 1997 | Azimuth Platform Structure Lateral Frame Structure Sect. E-E; F-F; G-G |
Autocad Drawing | 430e012b.dwg | 02 Jun 1997 | Azimuth Platform Structure Central Frame Structure General Assembly |
Autocad Drawing | 430e013b.dwg | 02 Jun 1997 | Azimuth Platform Structure Lateral Pad Support |
Autocad Drawing | 431e002a.dwg | 06 Jun 1997 | Azimuth Platform Fixed Equipment Roller Bearing Disassembly |
3.2 Reference Drawings and Documents
Document Type | Drawing CAN # |
Revision Date | Assembly / Part Name |
---|---|---|---|
Autocad Drawing | 400e003b.dwg | 06 Jun 1997 | Telescope Azimuth Assembly Azimuth Frame Mounting Phase 1/7 |
Autocad Drawing | 400e033b.dwg | 02 Jun 1997 | Telescope Azimuth Assembly Azimuth Frame Mounting Support Device Central Structure |
Autocad Drawing | 400e034b.dwg | 02 Jun 1997 | Telescope Azimuth Assembly Azimuth Frame Mounting Azimuth Jack System Assembly |
Autocad Drawing | 400e036b.dwg | 02 Jun 1997 | General Telescope Telescope Azimuth Assembly Azimuth Frame Mounting - Az. Jack |
Autocad Drawing | 407e000c.dwg | 15 Jul 1997 | Telescope Special Utilities Access to the Telescope General Layout; 3D View |
Autocad Drawing | 407e001c.dwg | 15 Jul 1997 | Telescope Special Utilities Access to the Telescope General Layout; 3D View |
Autocad Drawing | 421e029c.dwg | 16 Jun 1997 | Pier Construction Drawings Ring Steel Structure General Assembly |
Autocad Drawing | 440a010a.dwg | 14 Mar 1997 | Telescope Hydrostatic System Elevation Lateral Floating Support |
Autocad Drawing | 440a011a.dwg | 14 Mar 1997 | Telescope Hydrostatic System Elevation Lateral Fix Support |
Autocad Drawing | 440a012a.dwg | 14 Mar 1997 | Telescope Hydrostatic System Elevation Support |
Autocad Drawing | 440a014a.dwg | 14 Mar 1997 | Telescope Hydrostatic System Azimuth Support |
Autocad Drawing | 460a009b.dwg | 24 Jan 1997 | Azimuth Drive Mechanical Roller Bearing for Azimuth Support |
Autocad Drawing | 460a010a.dwg | 17 Mar 1997 | Azimuth Drive Mechanical [sic] Elevation Drive System |
Autocad Drawing | 460a011a.dwg | 17 Mar 1997 | Azimuth Drive Mechanical General Assembly Azimuth Rim Gear Wheel |
Autocad Drawing | 461e001a.dwg | 28 Aug 1997 | Azimuth Endstops and Limits Interface of Rotation Between Enclosure and Azimuth Frame |
Autocad Drawing | 462a010b.dwg | 03 Mar 1997 | Azimuth Drive Application Track Section |
Autocad Drawing | 470a010b.dwg | 05 Mar 1997 | Azimuth Encoder Mechanical Azimuth Measuring System, Details |
Autocad Drawing | 470a011b.dwg | 03 Mar 1997 | Azimuth Encoder Mechanical Azimuth Measuring System, General Assembly |
Autocad Drawing | 500e020b.dwg | 06 Jun 1997 | General Elevation Assembly Elevation Mount Assembling Phase 07/42 |
Autocad Drawing | 520a012b.dwg | 14 Mar 1997 | Elevation Drive Application C-Ring Section |
Autocad Drawing | 520a013a.dwg | 17 Mar 1997 | Elevation Drive Mechanical [sic] Azimuth Drive System |
Autocad Drawing | 522a010a.dwg | 17 Mar 1997 | Elevation Rollshield |
Autocad Drawing | 523a010b.dwg | 21 Jul 1997 | Elevation Emergency Drive Stow Pin and Auxiliary Drive |
Autocad Drawing | 523a011b.dwg | 21 Jul 1997 | Elevation Emergency Drive Auxiliary Drive |
Autocad Drawing | 524a010b.dwg | 21 Jul 1997 | Elevation Stow Pin Stow Pin |
Autocad Drawing | 530a010b.dwg | 05 Mar 1997 | Elevation Encoder Mechanical Elevation Measuring System, Details |
Autocad Drawing | 530a011b.dwg | 04 Mar 1997 | Elevation Encoder Mechanical Elevation Measuring System, General Assembly |
Technical Specification | 401e028e.doc 401e028e.htm | 01 Sep 1997 | Telescope Pre-Erection |
Reference | 001s006c.htm | 02 Jun 1997 | LBT Drawing Standards |