1. Description of Tasks
2. Procedures
3. Documents
================================================
The Supply includes: the preparation of shop drawings; the construction and the machining of the steel structure of the equalizing beams and wheel supports, and the subsequent integration of the wheels, articulation axes, bearings and mechanical accessories.
Assembly and integration of the bogie units will include integration of the eight (8) motor / gearbox units (plus one spare) to be supplied by the LBTPO.
A set of eight (4 x 2 = 8) adjustable tie rods are required for holding the bogies in place over the Circular Rail during the enclosure erection. The Supplier is asked to design and supply these adjustable tie rods to attach to existing embed plates in the telescope pier.
The Supply also includes verification testing to ascertain that the functionality and proper alignment of the bogie units has been achieved. These tests include the functionality of each driving wheel on its bogie, and the verification of the correct alignment and convergence of the wheels in each bogie.
The proposal should include a timeline of the Supply activities.
Please list the shipping costs as a separate item from the price of the main supply.
1.2 Deliverable Hardware
Listed in the table below are all the hardware components to be
delivered as part of this Statement of Work.
Line Item |
Quantity for Delivery |
Drawing CAN # |
Description of Hardware Item |
---|---|---|---|
1 | 2 | 341a000 | Front Bogie Assembly |
2 | 2 | 341a000 | Rear Bogie Assembly |
3 | 1 | 341a002 | Spare Drive Wheel Assembly |
4 | 8 | 341a007 | Temporary Alignment Tie-Rods |
5 | TBD | Bogie Bolts and Dowels |
1.3 Deliverable Documents
Described in this section are all the manuals, plans, drawings and
documentation that will be requested from the Supplier as part of this
Statement of Work. All documents shall be supplied in four (4) hard
copies and one (1) digital copy.
Documentation packages, shall be supplied in support of the following functional activities:
The test and inspections shall include:
1.3.3.1 Test Procedures
The Test Procedures shall describe in detail all the necessary operations to perform verification through a test. A Test Procedure shall be produced for every verification test required and shall contain the following information:
1.3.3.2 Test Reports
The Test Reports shall summarize the findings of the tests. The Test Report shall be submitted to the LBTC not later than 30 days after the test. A Test Report shall contain the following information:
All the workshop drawings must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.
1.3.5.2 As-Built Drawings
The LBTPO shall receive copies of the updated "as-built" drawings and documentation not later than 30 days after the completion of the acceptance tests.
All steel structures shall be packed in such a way as to guarantee:
2.2 Technical Liaison
The Supplier shall provide access to all phases of each task in this
Supply to the appropriately designated LBTC representative(s). The
designated Technical Representative(s) is (are):
Walter Gallieni ADS Italia Srl Corso Promessi Sposi 23/D 22053 Lecco ITALY telephone: 39-341-259-231 telefax: 39-341-250-560 email: ads.gallieni@enet.it URL: http://www.enet.it/ads
The Supplier shall maintain informal technical liaison with the LBT Project Technical Representative(s). These representative(s) shall be provided the following:
All workshop drawings regarding fabrication and construction must be submitted to the LBTC Technical Representative for approval before purchasing any materials and/or beginning any construction.
LBTC approval will cover only the functional and conceptual aspects of the design and will not cover the correctness of the dimensions and practicality of the machining. Approval of the drawings shall not indicate acceptance of the Work.
2.3 Technical Changes
All ECRs, NCRs, and Requests for Waivers or Deviations will be presented to the Technical
Representative(s) for further evaluation, formulation of responses, and recommendations to the LBT
Director.
2.3.1 Engineering Change Request
In the event that the Supplier deems it necessary to deviate from any specification or term of the Technical Specifications or the Proposal, the Supplier shall deliver to the Technical Representative(s) an Engineering Change Request (ECR) setting forth:
2.3.2 Non-Conformance Report (NCR)
The Supplier shall report all non-conformities from the Technical Specifications which occur during the manufacture, assembly, or testing at all levels of the Work. Each Non-Conformance-Report shall set forth the following:
2.3.3 Request for Waiver/Deviation
A Request for Waiver may be issued during the manufacturing, test or integration of a deliverable item to:
A granted waiver does not lead to changes of any approved and released documents. The Request for Waiver shall include:
It shall be accompanied by all documentation required by the LBT Corporation to judge the acceptability of the waiver. If any change in the schedule or performance are expected, these points shall be clearly addressed.
2.4 Point of Delivery
All documents shipped as a result of this Statement of Work shall be
sent to the LBT Project Office:
LBT Project Office/USA The University of Arizona Steward Observatory Tucson, AZ 85721-0065 USA
All hardware shipped as a result of this Statement of Work shall be
sent to the LBT Staging Area at the Base Camp of the Mount Graham
International Observatory:
Large Binocular Telescope Corporation MGIO Base Camp 1480 W. Swift Trail Safford, AZ 85546-8053 USA
Category: Sub-Category: Assembly: |
300 - Rotating Enclosure 30_ - General Rotating Enclosure 301 - Rotating Architectural |
---|---|
Category: Sub-Category: Assembly: |
300 - Rotating Enclosure 34_ - Rotating Enclosure Drive 341 - Enclosure Drive Mechanical |
Document Type |
Drawing CAN # |
Revision Date |
Assembly / Part Name |
---|---|---|---|
Technical Specification | 301a003d.doc 301a003d.htm | 05 Jun 1997 | Telescope Rotating Enclosure Rotation Bogies and Drives |
Technical Report | 301a002c.doc 301a002c.htm | 12 Jun 1997 | Telescope Rotating Enclosure Rotation Bogies and Drives |
Autocad Drawing | 341a000b.dwg | 13 Jan 1997 | Enclosure Drive Mechanical, Rear & Front Bogies Assembly |
Autocad Drawing | 341a001b.dwg | 13 Jan 1997 | Enclosure Drive Mechanical, Horizontal Guide Rollers |
Autocad Drawing | 341a002b.dwg | 13 Jan 1997 | Enclosure Drive Mechanical, Drive Wheel Assembly |
Autocad Drawing | 341a003a.dwg | 20 Sep 1996 | Enclosure Drive Mechanical, Stowpin Assembly |
Autocad Drawing | 341a004b.dwg | 13 Jan 1997 | Enclosure Drive Mechanical, Leg Bottom Flange Connection to Bogies |
Autocad Drawing | 341a006b.dwg | 10 Jan 1997 | Enclosure Drive Mechanical, Plant General |
Autocad Drawing | 341a007b.dwg | 13 Jan 1997 | Enclosure Drive Mechanical, Lateral Section |
Autocad Drawing | 341a009a.dwg | 27 Mar 1997 | Enclosure Drive Mechanical, Typical Assembly of Direct Drives with Reaction Arm |
Autocad Drawing | 341a010a.dwg | 27 Mar 1997 | Enclosure Drive Mechanical, Typical Detail of Reaction Arm |
3.2 Reference Drawings and Documents
Category: Sub-Category: Assembly: |
2__ - Fixed Enclosure 27_ - Circular Runway for Enclosure 270 - Enclosure Track |
---|---|
Category: Sub-Category: Assembly: |
400 - Telescope Azimuth Platform 42_ - Pier 421 - Pier |
Document Type |
Drawing CAN # |
Revision Date |
Assembly / Part Name |
---|---|---|---|
Autocad Drawing | 341a008a.dwg | 21 Mar 1997 | Enclosure Drive Mechanical, Detail of Pier Holes for Bogies Alignment |
Autocad Drawing | 421m002b.dwg | 31 Mar 1997 | Pier Construction Drawing, Section and Developed View (Location of Pier Embeds for Bogie Tie-Rods) |
Autocad Drawing | 270e002c.dwg | 07 Feb 1997 | Circular Rail & Embedded Beam, General Assembly |
Reference | 001s006c.htm | 02 Jun 1997 | LBT Drawing Standards |