1. Description of Tasks
2. Procedures
3. Documents
================================================
To simplify the preparation of Shop Drawings for the Windbracing Structure, LBTPO and EIE will provide detailed construction drawings for each of the complex nodes in the Windbracing Structure. These drawings will include the development of each node into sub-elements such as plates, reinforcements, bolts, etc. These drawings will also include the development of the pipes connecting the nodes. An example of these detailed drawings of a node has been provided as drawings 512e078, 512e079, 512e080 and 512e081.
The proposal should include a time line of the Supply activities.
Technical assistance during Pre-Erection of the telescope at the "to be determined" factory location or during final installation on Mt. Graham is not included in this Statement of Work. The LBTC reserves the right to negotiate for such services at a later time.
1.2 Deliverable Hardware
Listed in the table below are all the hardware components to be
delivered as part of this Statement of Work.
Line Item |
Quantity for Delivery |
Drawing CAN # |
Description of Hardware Item |
---|---|---|---|
1 | 1 | 511e002 | Top Assembly of Vertical Windbracing |
2 | 1 | 511e014 | Central Assembly of Vertical Windbracing |
3 | 2 | 511e009 | Diagonal Assembly of Vertical Windbracing (L & R) |
4 | 1 | 512e002 | Horizontal Windbracing Front Beam |
5 | 1 | 512e003 | Horizontal Windbracing Back Beam |
6 | 1 | 512e045 | Derotators Platform Horizontal Windbracing |
7 | 2 | 512e016 | Diagonal Assemblies Horizontal Windbracing |
8 | 1 | 512e018 | Central Assembly Horizontal Windbracing |
9 | 1 | 512e023 | Assembly Pi13 - Pi90 Horizontal Windbracing |
10 | 2 | 512e005 | External Nodes Back Assembly Horizontal Windbracing |
11 | 2 | 512e006 | External Nodes Central Assembly Horizontal Windbracing |
12 | 2 | 512e007 | External Nodes Front Assembly Horizontal Windbracing |
13 | 30 | TBD | Pipes |
14 | 2 | 510e009 510e010 | Nodes Pi26 and Pi27 |
15 | TBD | 512e047 512e052 512e064 etc. |
Adjustment Shims |
16 | TBD | N/A | Bolts and Fasteners |
Fasteners should be delivered with an excess over the required number. The excess should be 2% of the required number with a minimum of four fasteners for each size and length.
1.3 Deliverable Documents
Described in this section are all the manuals, plans, drawings and
documentation that must be supplied as part of this Statement of Work.
All documents shall be supplied in four (4) hard copies and one (1)
digital copy.
Documentation packages, shall be supplied in support of the following functional activities:
The test and inspections shall include:
1.3.2.1 Test Procedures
The Test Procedures shall describe in detail all the necessary operations to perform verification through a test. A Test Procedure shall be produced for every verification test required and shall contain the following information:
1.3.2.2 Test Reports
The Test Reports shall summarize the findings of the tests. The Test Report shall be submitted to the LBTC not later than 30 days after the test. A Test Report shall contain the following information:
All the workshop drawings must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.
1.3.3.2 As-Built Drawings
The LBTPO shall receive copies of the updated "as-built" drawings and documentation not later than 30 days after the completion of the acceptance tests, and at least 15 days prior to acceptance (see below).
2.2 Technical Liaison
The Supplier shall provide access to all phases of the Work to the
following LBTC Technical Representative(s):
Gianpietro Marchiori European Industrial Engineering Via Torino #65 D/E 30170 Mestre (VE) ITALY telephone: 39-41-531-7906 telefax: 39-41-531-7757 email: eiedir@ve.nettuno.it
The Supplier shall maintain informal technical liaison with the LBT Project Technical Representative(s). These representative(s) shall be provided the following:
All workshop drawings, parts lists and manufacturing plans must be submitted to the LBTC Technical Representative for approval before purchasing any materials and/or beginning any construction.
LBTC approval will cover only the functional and conceptual aspects of the design and will not cover the correctness of the dimensions and practicality of the machining. Approval of the drawings shall not indicate acceptance of the Work.
2.3 Technical Changes
All ECRs, NCRs, and Requests for Waivers or Deviations will be presented to the Technical
Representative(s) for further evaluation, formulation of responses, and recommendations to the LBT
Director.
2.3.1 Engineering Change Request
In the event that the Supplier deems it necessary to deviate from any specification or term of the Technical Specifications or the Proposal, the Supplier shall deliver to the Technical Representative(s) an Engineering Change Request (ECR) setting forth:
2.3.2 Non-Conformance Report (NCR)
The Supplier shall report all non-conformities from the Technical Specifications which occur during the manufacture, assembly, or testing at all levels of the Work. Each Non-Conformance-Report shall set forth the following:
2.3.3 Request for Waiver/Deviation
A Request for Waiver may be issued during the manufacturing, test or integration of a deliverable item to:
A granted waiver does not lead to changes of any approved and released documents. The Request for Waiver shall include:
It shall be accompanied by all documentation required by the LBT Corporation to judge the acceptability of the waiver. If any change in the schedule or performance are expected, these points shall be clearly addressed.
2.4 Point of Delivery
All documents shipped as a result of this Statement of Work shall be
sent to the LBT Project Office:
LBT Project Office/USA The University of Arizona Steward Observatory Tucson, AZ 85721-0065 USA
The arrangements for packing and delivery of hardware will be communicated to the Supplier through a letter from the LBTPO.
Document Type | Drawing CAN # |
Revision Date | Assembly / Part Name |
---|---|---|---|
Technical Specification | 401e030c.doc 401e030c.htm | 04 August 1997 | Elevation Structure Windbracing Structure |
Autocad Drawing | 510e000b.dwg | 29 May 1997 | Elevation Structure Assembly Windbracing Structure General Assembly Unifilar View |
Autocad Drawing | 510e001c.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 01 |
Autocad Drawing | 510e002b.dwg | 29 May 1997 | Elevation Structure Assembly Vert. Central Windb.- Internal Nodes Node Pi 02 |
Autocad Drawing | 510e003c.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 03 |
Autocad Drawing | 510e004b.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 04 |
Autocad Drawing | 510e005b.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 05 |
Autocad Drawing | 510e006b.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 06 |
Autocad Drawing | 510e009c.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 26 |
Autocad Drawing | 510e010b.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 27 |
Autocad Drawing | 510e011b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Windbracing External Nodes Node Pe 09 |
Autocad Drawing | 510e012b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pe 10 |
Autocad Drawing | 510e013b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pe 11 |
Autocad Drawing | 510e014b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pe 04 |
Autocad Drawing | 510e016b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Windbracing External Nodes Node Pe 06 |
Autocad Drawing | 510e017b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Windbracing External Nodes Node Pe 05 |
Autocad Drawing | 510e019b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Windbracing Internal Nodes Node Pi 19 |
Autocad Drawing | 510e020b.dwg | 30 May 1997 | Elevation Structure Assembly Vert. Central Windb. Internal Nodes Node Pi 18 |
Autocad Drawing | 510e022b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 15 |
Autocad Drawing | 510e023b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 17 |
Autocad Drawing | 510e024b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 13 |
Autocad Drawing | 510e025b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 16 |
Autocad Drawing | 510e026b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 07 - Pi 43 |
Autocad Drawing | 510e027c.dwg | 30 Jul 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 09 |
Autocad Drawing | 510e028c.dwg | 30 Jul 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 10 |
Autocad Drawing | 510e029b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 14 |
Autocad Drawing | 510e030b.dwg | 30 May 1997 | Elevation Structure Assembly Horiz. Central Windb. Internal Nodes Node Pi 11 - Pi 44 |
Autocad Drawing | 511e000c.dwg | 16 Jun 1997 | Vertical Central Bracing Internal Nodes Unifilar View |
Autocad Drawing | 511e002c.dwg | 25 Jun 1997 | Vertical Central Bracing Top Assembly |
Autocad Drawing | 511e009c.dwg | 25 Jun 1997 | Vertical Central Bracing Diagonal Assembly Side "L" |
Autocad Drawing | 511e014c.dwg | 25 Jun 1997 | Vertical Central Bracing Central Assembly |
Autocad Drawing | 512e000c.dwg | 16 Jun 1997 | Horizontal Bracing Unifilar View Horizontal Platform |
Autocad Drawing | 512e001c.dwg | 16 Jun 1997 | Horizontal Bracing Internal Nodes Unifilar View |
Autocad Drawing | 512e002d.dwg | 30 Jul 1997 | Horizontal Bracing Front Beam |
Autocad Drawing | 512e003c.dwg | 25 Jun 1997 | Horizontal Bracing Back Beam |
Autocad Drawing | 512e004c.dwg | 16 Jun 1997 | Horizontal Bracing External Nodes Unifilar View |
Autocad Drawing | 512e005c.dwg | 25 Jun 1997 | Horizontal Bracing External Nodes Back Assembly Side "L" |
Autocad Drawing | 512e006c.dwg | 25 Jun 1997 | Horizontal Bracing External Nodes Central Assembly Side "L" |
Autocad Drawing | 512e007c.dwg | 25 Jun 1997 | Horizontal Bracing External Nodes Front Assembly Side "L" |
Autocad Drawing | 512e011c.dwg | 16 Jun 1997 | Horizontal Bracing Lateral Back Beam Side "L" Sheet 1/2 |
Autocad Drawing | 512e015c.dwg | 16 Jun 1997 | Horizontal Bracing Lateral Front Beam Side "L" Sheet 1/2 |
Autocad Drawing | 512e016c.dwg | 25 Jun 1997 | Horizontal Bracing Diagonal Assembly Side "L" |
Autocad Drawing | 512e018d.dwg | 25 Jun 1997 | Horizontal Bracing Central Assembly |
Autocad Drawing | 512e023c.dwg | 25 Jun 1997 | Horizontal Bracing Assembly Pi 13 - Pi 90 |
Autocad Drawing | 512e026c.dwg | 16 Jun 1997 | Horizontal Bracing Internal Nodes Unifilar View |
Autocad Drawing | 512e039d.dwg | 30 Jul 1997 | Horizontal Bracing Front Beam Sheet 1/3 |
Autocad Drawing | 512e042c.dwg | 16 Jun 1997 | Horizontal Bracing Back Beam Sheet 1/2 |
Autocad Drawing | 512e045c.dwg | 16 Jun 1997 | Horizontal Bracing Rotators Structure Sheet 1/5 |
Autocad Drawing | 512e046c.dwg | 16 Jun 1997 | Horizontal Bracing Lateral Back Beam Side "L" Adjustment Flange 1-2-3-4 Sh. 2/2 |
Autocad Drawing | 512e047c.dwg | 16 Jun 1997 | Horizontal Bracing Lateral Front Beam Side "L" Flange 5 and Adjustments Sh. 2/2 |
Autocad Drawing | 512e048c.dwg | 16 Jun 1997 | Horizontal Bracing Back Beam Drilling Flange and Adjst. Sh. 2/2 |
Autocad Drawing | 512e049c.dwg | 16 Jun 1997 | Horizontal Bracing Front Beam Details and Sections Sh. 2/3 |
Autocad Drawing | 512e051d.dwg | 16 Jun 1997 | Horizontal Bracing Rotators Structure Sections Sh. 2/5 |
Autocad Drawing | 512e052c.dwg | 16 Jun 1997 | Horizontal Bracing Front Beam Adjustment Flange 1 to 8 Sh. 3/3 |
Autocad Drawing | 512e063e.dwg | 15 Jul 1997 | Horizontal Bracing Rotators Structure Sections - Views and Flanges Sh. 3/5 |
Autocad Drawing | 512e064c.dwg | 16 Jun 1997 | Horizontal Bracing Rotators Structure Adjustments Sh. 4/5 |
Autocad Drawing | 512e065c.dwg | 16 Jun 1997 | Horizontal Bracing Rotators Structure Details Sh. 5/5 |
Autocad Drawing | 512e066d.dwg | 15 Jul 1997 | Horizontal Bracing Rotators Structure Floor Plate |
Autocad Drawing | 512e078b.dwg | 16 Jun 1997 | Horizontal Bracing Construction Assembly Sheet 1/4 |
Autocad Drawing | 512e079b.dwg | 16 Jun 1997 | Horizontal Bracing Details Sheet 2/4 |
Autocad Drawing | 512e080b.dwg | 16 Jun 1997 | Horizontal Bracing Details Sheet 3/4 |
Autocad Drawing | 512e081b.dwg | 16 Jun 1997 | Horizontal Bracing Details Sheet 4/4 |
Autocad Drawing | 513e002d.dwg | 15 Jul 1997 | Central Structure Rotators Structure Orthogonal View |
Autocad Drawing | 513e003d.dwg | 15 Jul 1997 | Central Structure Rotators Structure Plan View |
Autocad Drawing | 513e004c.dwg | 02 Jun 1997 | Central Structure Rotators Structure Details |
Autocad Drawing | 513e005c.dwg | 16 Jun 1997 | Central Structure Rotators Structure Rotator Supp. Lower Back Beam |
3.2 Reference Drawings and Documents
Document Type | Drawing CAN # |
Revision Date | Assembly / Part Name |
---|---|---|---|
Autocad Drawing | 406e002a.dwg | 20 May 1997 | Central Structure Hydraulic Utilities Dynamic Balancing System |
Autocad Drawing | 407e001c.dwg | 15 Jul 1997 | Telescope Special Utilities Access to the Telescope General Layout; 3D View |
Autocad Drawing | 407e002c.dwg | 15 Jul 1997 | Telescope Special Utilities Access to the Telescope General Layout; Orthogonal Views |
Autocad Drawing | 514e003c.dwg | 30 Jul 1997 | Rolling Sectors General Mount of C-Rings "L" and "R" |
Autocad Drawing | 514e004d.dwg | 30 Jul 1997 | Rolling Sectors General Assembly of C-Ring "L" |
Autocad Drawing | 514e024b.dwg | 30 Jul 1997 | Rolling Sectors C-Ring "R" Carpentry Rolling Sector Structure sh.1/3 |
Autocad Drawing | 721e003a.dwg | 04 Jun 1997 | M1 Cell Structure M1 Cell Interface - Sheet 1/2 |
Autocad Drawing | 721e004a.dwg | 04 Jun 1997 | M1 Cell Structure M1 Cell Interface - Sheet 2/2 |
Autocad Drawing | 721a011d.dwg | 11 Aug 1996 | M1 Cell Structure Interfaces to El. Structure |
Technical Specification | 401e028e.doc 401e028e.htm | 01 Sep 1997 | Telescope Pre-Erection |
Reference | 001s006c.htm | 02 Jun 1997 | LBT Drawing Standards |