5.1 Delivery Date
LBTO aims for delivery of a complete mask manufacturing unit in fall 2007. Delivery dates earlier than this are not considered as an advantage, but are certainly acceptable.5.2 Manufacturing Plan
The proposal should include a description of the manufacturing plan consisting of at least the following items:
- A complete schedule for the project including dates for major milestones from signing of the contract (assume 1 July 2007) to final delivery of the machine (if possible in Gantt diagram form). Contractual duties associated with milestones (progress reports, acceptances, meetings, payments, etc.) must be clearly defined.
- A list of the most challenging specifications/requirements or potential delays to the production schedule, along with a discussion of how the vendor intends to address each in the design.
- A description of how the design will be verified to LBTO before manufacturing starts (design review).
- A description of how the finished machine will be acceptance tested. One possible test would be to use the machine to manufacture a test mask for each instrument and verify that they meet the necessary requirements.
5.3 Management and quality assurance
The proposal must contain a section describing the organizational structure proposed for this activity, including a description of the skills and roles of the key persons and of methods to be adopted to reduce the technical risks and/or the risks of delays. The proposers should provide descriptions of their experience with laser drilling or milling units of similar capabilites.
| Large Binocular Telescope Observatory | Phone: +1 (520) 626-5231 |
| The University of Arizona | Fax: +1 (520) 626-9333 |
| 933 N Cherry Avenue | e-mail: gkoeppen@as.arizona.edu (Grisela Koeppen) |
| Tucson, AZ 85721-0065 USA |
| LBT Proposal Evaluation Criteria |
| Meets Performance Requirements/Goals |
| Cost |
| Cost |
| Quality Assurance, Safety, Reliability |
| Ease of Use and Maintenance |
| Delivery Schedule |
| Technical Capability |
| Technical Proposal |
| Management Capability |
| Financial Stability |