Large Binocular Telescope Project

Attachment A to the RFP for the

Telescope M1 Mirror Covers

STATEMENT OF WORK

20 April 2004

TABLE OF CONTENTS

1. Description of Tasks

2. Procedures

3. Documents

================================================

1. Description of Tasks

1.1 Supply Description

1.1.1 Telescope M1 Mirror Covers

The supply includes: the construction and assembly of two folding Mirror Covers which protect the two 8.4 meter diameter primary mirrors of the Large Binocular Telescope.

Each Mirror Cover assembly consists of a swing arm with a rotation mechanism to move it “in” and “out” of the M1 mirror axis; and on the swing arm a circular deployable umbrella is supported along with an electromechanical device to "open" and "close" it on the M1 mirror area. The M1 Mirror Cover must be able to be opened and closed in every position, between 0 and 90 degrees, of the elevation structure of the Telescope.

The supply consists of one pair of complete Mirror Covers with a right- and left-handed configuration. Our drawings show the right-hand swing arm.

In detail the supply includes:

The M1 Mirror Cover attaches to the front of the already existing M1 Cell. The M1 Cell structure is not included in this supply.

1.1.2 Technical Specifications

The hardware will be manufactured in accordance with the Large Binocular Telescope Project's Technical Specification "401a022", entitled "Rotating Supporting Arms with the fabric retractable cover of the Primary Mirrors", revision "d", dated February 26, 2004  and in accordance with the applicable drawings listed below. These drawings represent a quite detailed concept; however we assume that the Supplier will produce their own detailed fabrication drawings which incorporate local best practice and procedure.

1.1.3 Delivery Date

The preferred delivery date for the Mirror Covers is November 22, 2004.

The proposal should include a timeline of the Supply of all activities not including packing and shipment.

1.1.4 Shipping

The Supply does not include packing and shipping of the assembled Mirror Covers. The packing and shipping of the Mirror Covers may be included as an option in the proposal.

 

1.2 Deliverable Hardware

1.2.1 Hardware to be manufactured or supplied

Listed in the table below are all the hardware components to be delivered as part of this Supply.

 

Line
Item

Quantity for
Delivery

Drawing CAN #

Description of Hardware Item

1

1

727a007

 Mirror Cover Assembly  (Right Location)

2

1

similar

 Mirror Cover Assembly  (Left Location)

3

TBD

N/A

 Bolts and Fasteners

Fasteners should be delivered with an excess over the required number. The excess should be 3% of the required number with a minimum of four fasteners for each size and length.

1.3 Deliverable Documents

Described in this section are all the manuals, plans, drawings and documentation that must be supplied as part of this Statement of Work. All documents shall be supplied in two (2) hard copies and one (1) digital copy.

Documentation packages shall be supplied in support of the following functional activities:

1.3.1 Operations Manual

Prepare and deliver an Operations Manual that shall describe in detail the procedures needed to operate correctly and safely. It shall at least:

1.3.2 Maintenance Manual

The maintenance manual shall contain detailed maintenance procedures with drawings. It shall contain the maintenance requirements and scheduling for all the items included in the supplies of this Statement of Work. Besides the description of the maintenance actions, it shall provide a maintenance checklist with information about:

1.3.3 Acceptance Plan

Prepare and submit for approval an Acceptance Plan describing test procedures and inspections that shall be performed prior to acceptance. The Acceptance Plan must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approved.

The test and inspections shall include:

1.3.3.1 Test Procedures

The Test Procedures shall describe in detail all the necessary operations to perform verification through a test. A Test Procedure shall be produced for every verification test required and shall contain the following information:

The Test Procedure shall be submitted for review prior to performing the test and shall also be incorporated in the specific Test Report.

1.3.3.2 Test Reports

The Test Reports shall summarize the findings of the tests. The Test Report shall be submitted to the LBTC not later than 30 days after the test. A Test Report shall contain the following information:

1.3.4 Spare Parts List

The Spare Parts List shall contain all the relevant information concerning the required spare parts recommended for initial operations and for ten years of operation such as:

1.3.5 Drawings

All drawings shall be prepared with AUTOCAD 2000, MDT6 or compatible format. Where practical all the AUTOCAD drawings produced should comply with the LBT Drawing Standards "001s006". All the workshop assembly and sub-assembly drawings as well as the "as-built" drawings shall include the following information:


1.3.5.1 Design Review

A Design Review package including dimensional drawings and design specifications must be submitted to the Technical Representative for approval before starting the preparation of detailed Workshop Drawings. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.

1.3.5.2 Workshop Drawings

All the workshop drawings must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.

1.3.5.3 As-Built Drawings

The LBTPO shall receive copies of the updated "as-built" drawings and documentation not later than 30 days after the completion of the acceptance tests.

1.3.6 Storage and Shipping Plan

Prepare a storage/shipping plan and submit it to the Technical Representative(s) for approval. The plan should provide detailed instructions regarding unpacking and handling, and should provide the determination of volume and weight in relation to the transportation means.

1.3.7 Progress Reports to the LBTC

Reports on the status of the work covered by this contract should be sent to the LBTPO every two months. The Progress Report shall include an update of the initially proposed schedule (section 3.6.1 of the Proposal format).

2. Procedures

2.1 Acceptance

The Work shall be conditionally accepted by LBTC upon delivery and completion of the Work (including the acceptance tests in the factory) in a manner at that time satisfactory to LBTC. Final acceptance will be made subsequent to the installation into the Large Binocular Telescope or after a time not to exceed 90 days.

2.2 Technical Liaison

The Supplier shall provide access to all phases of the Work to the following LBTC Technical Representative(s):

 


TECHNICAL REPRESENTATIVE TO BE NAMED AT THE TIME OF CONTRACT AWARD

The Supplier shall maintain informal technical liaison with the LBT Project Technical Representative(s). These representative(s) shall be provided the following:

All workshop drawings regarding fabrication and construction must be submitted to the LBTC Technical Representative for approval before purchasing any materials and/or beginning any construction.

LBTC approval will cover only the functional and conceptual aspects of the design and will not cover the correctness of the dimensions and practicality of the machining. Approval of the drawings shall not indicate acceptance of the Work.

2.3 Technical Changes

All ECRs, NCRs, and Requests for Waivers or Deviations will be presented to the Technical Representative(s) for further evaluation, formulation of responses, and recommendations to the LBT Director.

2.3.1 Engineering Change Request

In the event that the Supplier deems it necessary to deviate from any specification or term of the Technical Specifications or the Proposal, the Supplier shall deliver to the Technical Representative(s) an Engineering Change Request (ECR) setting forth:

2.3.2 Non-Conformance Report (NCR)

The Supplier shall report all non-conformities from the Technical Specifications which occur during the manufacture, assembly, or testing at all levels of the Work. Each Non-Conformance-Report shall set forth the following:

2.3.3 Request for Waiver/Deviation

A Request for Waiver may be issued during the manufacturing, test or integration of a deliverable item to:

A granted waiver does not lead to changes of any approved and released documents. The Request for Waiver shall include:

It shall be accompanied by all documentation required by the LBT Corporation to judge the acceptability of the waiver. If any change in the schedule or performance are expected, these points shall be clearly addressed.

2.4 Point of Delivery

All documents shipped as a result of this Statement of Work shall be sent to the LBT Project Office:

LBT Project Office/USA
The University of Arizona
933 N Cherry Avenue
Tucson, AZ  85721-0065
USA

All hardware shipped as a result of this Statement of Work shall be sent to:

Large Binocular Telescope Observatory
MGIO Base Camp
1480 W Swift Trail
Safford, AZ  85546-8053
USA

The Supplier is not requested for packing and shipment.

3. Documents

3.1 Applicable Drawings and Documents

Document
Type

Drawing
CAN #

Revision
Date

Assembly / Part Name

Technical Specification

401a022d.doc

401a022d.htm

26 Feb 2004

Technical Specification / Rotating Supporting Arms with the fabric retractable cover of the primary mirrors

Autocad Drawing

727a007b.dwg

23 Jul 2001

M1 Mirror Cover
General Assembly

Autocad Drawing

727a008b.dwg

15 Jul 2001

M1 Mirror Cover
Rotating arm with driving system

Autocad Drawing

727a009b.dwg

15 Jul 2001

M1 Mirror Cover
Arms cover with guiding and driving system

Autocad Drawing

727a011b.dwg

23 Jul 2001

M1 Mirror Cover
Retractable Fabric Cover with Centre and External Anchorings

Autocad Drawing

727a012a.dwg
727a013a.dwg
727a014a.dwg
727a015a.dwg
727a016b.dwg
727a017a.dwg
727a018b.dwg
727a019a.dwg
727a020a.dwg
727a021b.dwg
727a022a.dwg
727a023a.dwg
727a024a.dwg
727a025b.dwg
727a026a.dwg
727a027a.dwg
727a028a.dwg

 

M1 Mirror Cover
Drive Unit Assembly
subassemblies and details

Autocad Drawing

727a029a.dwg
727a032a.dwg
727a033a.dwg
727a034a.dwg
727a035a.dwg
727a036a.dwg
727a037a.dwg
727a038a.dwg
727a039a.dwg
727a040a.dwg
727a041a.dwg
727a042a.dwg
727a043a.dwg
727a044a.dwg
727a045a.dwg
727a046a.dwg
727a047a.dwg

 

M1 Mirror Cover
Retractable Fabric Cover
subassemblies and details

Autocad Drawing

727a048a.dwg
727a049a.dwg
727a050a.dwg
727a051a.dwg
727a052a.dwg
727a053a.dwg
727a054a.dwg
727a055a.dwg
727a056a.dwg
727a057a.dwg
727a058a.dwg
727a059a.dwg
727a060a.dwg
727a061a.dwg
727a062a.dwg
727a063a.dwg
727a064a.dwg
727a065a.dwg
727a066a.dwg
727a067a.dwg
727a068a.dwg
727a069a.dwg
727a070a.dwg
727a071a.dwg
727a072a.dwg
727a073b.dwg

 

M1 Mirror Cover
Arms with Guiding and Driving System
subassemblies and details

Autocad Drawing 727a005b.dwg   M1 Mirror Cover
M1 Cell Dummy for M1 Mirror Cover
Autocad Drawing 727a006a.dwg   M1 Mirror Cover
Test Bench for Mirror Cover

3.2 Reference Drawings and Documents

Document
Type

Drawing
CAN #

Revision
Date

Assembly / Part Name

Technical Report

 

727a010c.doc

727a010c.htm

13 Jul 2001

 Technical Report of M1 Covering System

Autocad Drawing721x220c.dwg 05 Oct 2000M1 Cell Construction Drawings
M1 Cell "R" -- General Assembly
Sheet 1/2
Autocad Drawing721x221b.dwg 05 Oct 2000M1 Cell Construction Drawings
M1 Cell "R" -- General Assembly
Sheet 2/2
Autocad Drawing721x230d.dwg 05 Oct 2000M1 Cell Construction Drawings
M1 Cell "R" -- Machining
Sheet 1/4
Autocad Drawing721x231b.dwg 24 Aug 2000M1 Cell Construction Drawings
M1 Cell "R" -- Machining
Sheet 2/4
Autocad Drawing721x232d.dwg 25 Mar 2001M1 Cell Construction Drawings
M1 Cell "R" -- Machining
Sheet 3/4
Autocad Drawing721x233d.dwg 05 Oct 2000M1 Cell Construction Drawings
M1 Cell "R" -- Machining
Sheet 4/4
Reference 001s006c.htm 02 Jun 1997 LBT Drawing Standards

Previous Page