1. Description of Tasks
2. Procedures
3. Documents
================================================
In detail the supply includes:
The proposal should include a timeline of the Supply activities including shipping to Milan, Italy where the Factory Pre-Erection of the Telescope Structure will occur.
The items will reside in Milan for approximately one year, and then will be shipped along with the telescope structure to the final erection location on Mt. Graham in Arizona. The Supply does not include shipping the swings arms to Arizona.
Please list the shipping and insurance costs to Milan as separate items from the price of the main supply.
Vendors in North America may propose direct shipping to Safford, Arizona as an option instead of shipping to Milan.
Line Item |
Quantity for Delivery |
Drawing CAN # | Description of Hardware Item |
---|---|---|---|
1 | 2 | 541a024 | M2/F15 Secondary Swing Arm Assembly (R+L) |
2 | 2 | 543a024 | M3 Tertiary Swing Arm Assembly (R+L) |
3 | TBD | N/A | Bolts and Fasteners |
Fasteners should be delivered with an excess over the required number. The excess should be 2% of the required number with a minimum of four fasteners for each size and length.
1.3 Deliverable Documents
Described in this section are all the manuals, plans, drawings and
documentation that must be supplied as part of this
Statement of Work. All documents shall be supplied in four (4) hard
copies and one (1) digital copy.
Documentation packages, shall be supplied in support of the following functional activities:
The test and inspections shall include:
1.3.3.1 Test Procedures
The Test Procedures shall describe in detail all the necessary operations to perform verification through a test. A Test Procedure shall be produced for every verification test required and shall contain the following information:
1.3.3.2 Test Reports
The Test Reports shall summarize the findings of the tests. The Test Report shall be submitted to the LBTC not later than 30 days after the test. A Test Report shall contain the following information:
A Design Review package including dimensional drawings and design specifications must be submitted to the Technical Representative for approval before starting the preparation of detailed Workshop Drawings. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.
1.3.5.2 Workshop Drawings
All the workshop drawings must be submitted to the Technical Representative for approval before starting the construction and materials purchase. The Technical Representative shall comment on the request within 15 days from the receipt, and in the event of no comment the request is to be considered approval.
1.3.5.3 As-Built Drawings
The LBTPO shall receive copies of the updated "as-built" drawings and documentation not later than 30 days after the completion of the acceptance tests.
All steel structures shall be packed in such a way as to guarantee:
2.2 Technical Liaison
The Supplier shall provide access to all phases of the Work to the
following LBTC Technical Representative(s):
Daniele Gallieni ADS International Srl Corso Promessi Sposi 23/D 23900 Lecco ITALY telephone: 39-0341-259-231 telefax: 39-0341-259-235 email: ads.dgallieni@enet.it URL: http://www.enet.it/ads
The Supplier shall maintain informal technical liaison with the LBT Project Technical Representative(s). These representative(s) shall be provided the following:
All workshop drawings regarding fabrication and construction must be submitted to the LBTC Technical Representative for approval before purchasing any materials and/or beginning any construction.
LBTC approval will cover only the functional and conceptual aspects of the design and will not cover the correctness of the dimensions and practicality of the machining. Approval of the drawings shall not indicate acceptance of the Work.
2.3 Technical Changes
All ECRs, NCRs, and Requests for Waivers or Deviations will be
presented to the Technical Representative(s) for further evaluation,
formulation of responses, and recommendations to the LBT Director.
2.3.1 Engineering Change Request
In the event that the Supplier deems it necessary to deviate from any specification or term of the Technical Specifications or the Proposal, the Supplier shall deliver to the Technical Representative(s) an Engineering Change Request (ECR) setting forth:
2.3.2 Non-Conformance Report (NCR)
The Supplier shall report all non-conformities from the Technical Specifications which occur during the manufacture, assembly, or testing at all levels of the Work. Each Non-Conformance-Report shall set forth the following:
2.3.3 Request for Waiver/Deviation
A Request for Waiver may be issued during the manufacturing, test or integration of a deliverable item to:
A granted waiver does not lead to changes of any approved and released documents. The Request for Waiver shall include:
It shall be accompanied by all documentation required by the LBT Corporation to judge the acceptability of the waiver. If any change in the schedule or performance are expected, these points shall be clearly addressed.
2.4 Point of Delivery
All documents shipped as a result of this Statement of Work shall be
sent to the LBT Project Office:
LBT Project Office/USA The University of Arizona Steward Observatory Tucson, AZ 85721-0065 USA
All hardware shipped as a result of this Statement of Work shall be
sent to :
Large Binocular Telescope Corporation c/o Ansaldo Energia S.p.A. Viale Sarca, 336 20126 Milano Italia
Document Type |
Drawing CAN # |
Revision Date |
Assembly / Part Name |
---|---|---|---|
Technical Specification | 401a005d.doc 401a005d.htm | 26 May 1999 | Swing Arm Spiders |
Autocad Drawing | 541a006a.dwg | 03 Mar 1999 | F/15 Swing Arms General Assembly Structural Assembly Diagram |
Autocad Drawing | 541a007b.dwg | 27 May 1999 | F/15 Swing Arms General Assembly Plan View |
Autocad Drawing | 541a008b.dwg | 27 May 1999 | F/15 Swing Arms General Assembly Spider Closed - Plan View |
Autocad Drawing | 541a009b.dwg | 27 May 1999 | F/15 Swing Arms General Assembly Intermediate position verification |
Autocad Drawing | 541a010a.dwg | 03 Mar 1999 | F/15 Swing Arms General Assembly View A-A - Section B-B |
Autocad Drawing | 541a011a.dwg | 03 Mar 1999 | F/15 Swing Arms Structural Assembly Diagram Spider Closed |
Autocad Drawing | 541a012b.dwg | 27 May 1999 | F/15 Swing Arms Detail Articulation F Spider Drive |
Autocad Drawing | 541a013a.dwg | 03 Mar 1999 | F/15 Swing Arms General Assembly Detail Joint "A" |
Autocad Drawing | 541a014a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Joint "B" |
Autocad Drawing | 541a015a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Support "C" |
Autocad Drawing | 541a016a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Support "D" |
Autocad Drawing | 541a017a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Articulation "E" |
Autocad Drawing | 541a018a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Support "G" |
Autocad Drawing | 541a019a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Support "H" |
Autocad Drawing | 541a020a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Support "I" |
Autocad Drawing | 541a021a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Articulation "E" Preload |
Autocad Drawing | 541a022a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Fork "H-I" |
Autocad Drawing | 541a023a.dwg | 03 Mar 1999 | F/15 Swing Arms Detail Stop |
Autocad Drawing | 541a024b.dwg | 29 Feb 1999 | F/15 Swing Arms General Assembly Plan View - View A-A |
Autocad Drawing | 541a025b.dwg | 29 Jan 1999 | F/15 Swing Arms General Assembly View B-B - View C-C |
Autocad Drawing | 541a026a.dwg | 03 Jul 1995 | F/15 swing arms General Assembly Detail joint B-1 |
Autocad Drawing | 541a027a.dwg | 03 Jul 1995 | F/15 Swing Arm General Assembly Detail joint B-2 |
Autocad Drawing | 541a028a.dwg | 03 Jul 1995 | F/15 Swing arms General Assembly Detail joint C-1 |
Autocad Drawing | 541a029a.dwg | 03 Jul 1995 | F/15 Swing arms General Assembly Detail joint C-2 |
Autocad Drawing | 541a030a.dwg | 03 Jul 1995 | F/15 Swing Arms General Assembly Detail Joint D-1 |
Autocad Drawing | 541a031a.dwg | 03 Jul 1995 | F/15 Swing Arms General Assembly Detail Joint D-2 |
Autocad Drawing | 541a032a.dwg | 03 Jul 1995 | F/15 Swing Arms General Assembly Detail Joint E-1 |
Autocad Drawing | 541a033a.dwg | 03 Jul 1995 | F/15 Swing Arms General Assembly Detail Joint E-2 |
Autocad Drawing | 541a034a.dwg | 03 Jul 1995 | F/15 Swing arms General Assembly Detail Joint F |
Autocad Drawing | 541a035b.dwg | 29 Jan 1999 | F/15 Swing Arms Mirror Support Dummy |
Autocad Drawing | 543a006b.dwg | 28 Apr 1999 | M3 Swing Arms Structural Assembly Diagram |
Autocad Drawing | 543a007b.dwg | 27 May 1999 | M3 Swing Arms Plan View |
Autocad Drawing | 543a008b.dwg | 27 May 1999 | M3 Swing Arms Spider Closed - Plan View |
Autocad Drawing | 543a009b.dwg | 27 May 1999 | M3 Swing Arms Intermediate Position Verification |
Autocad Drawing | 543a010a.dwg | 30 Apr 1999 | M3 Swing Arms View A-A - Section B-B |
Autocad Drawing | 543a011a.dwg | 30 Apr 1999 | M3 Swing Arms Structural Assembly Diagram Spider Closed |
Autocad Drawing | 543a012b.dwg | 27 May 1999 | M3 Swing Arms Detail Articulation F Spider Drive |
Autocad Drawing | 543a013a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Joint A |
Autocad Drawing | 543a014a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Joint B |
Autocad Drawing | 543a015a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Support C |
Autocad Drawing | 543a016a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Support D |
Autocad Drawing | 543a017a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Articulation E |
Autocad Drawing | 543a018a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Support G |
Autocad Drawing | 543a019a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Support H |
Autocad Drawing | 543a020a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Support "I" |
Autocad Drawing | 543a021a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Mechanism Articulation E Preload |
Autocad Drawing | 543a022a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Fork H-I |
Autocad Drawing | 543a023a.dwg | 30 Apr 1999 | M3 Swing Arms Detail Stop |
Autocad Drawing | 543a024b.dwg | 19 Apr 1999 | M3 Swing Arms General Assembly View D-D - View A-A |
Autocad Drawing | 543a025b.dwg | 03 Mar 1999 | M3 Swing Arms General Assembly View B-B - View C-C |
Autocad Drawing | 543a026a.dwg | 03 Jul 1995 | M3 Swing Arms General Assembly Detail Joint B-1 |
Autocad Drawing | 543a027a.dwg | 03 Jul 1995 | M3 Swing Arms General Assembly Detail Joint C-1 |
Autocad Drawing | 543a028a.dwg | 03 Jul 1995 | M3 Swing Arms General Assembly Detail Joint D-1 |
Autocad Drawing | 543a029a.dwg | 03 Jul 1995 | M3 Swing arms General Assembly Detail Joint E-1 |
Autocad Drawing | 543a030a.dwg | 03 Jul 1995 | M3 Swing Arms General Assembly Detail Joint F |
Autocad Drawing | 543a031b.dwg | 29 Apr 1999 | General Assembly Mirror Support Dummy |
Autocad Drawing | 543a033a.dwg | 19 Apr 1999 | M3 Swing Arms General Assembly View E-E - View A-A |
3.2 Reference Drawings and Documents
Document Type |
Drawing CAN # |
Revision Date |
Assembly / Part Name |
---|---|---|---|
Technical Report | 545a001b.doc 545a001b.htm | 27 May 1999 | Spiders Rotation and Preload Mechanisms |
Technical Report | 545a002a.doc 545a002a.htm | 30 Apr 1999 | Spider M2 |
Technical Report | 545a003c.doc 545a003c.htm | 7 May 1999 | Spider M3 |
Autocad Drawing | 543a034b.dwg | 21 May 1999 | M3 Swing Arm Study of Shadow |
Reference | 001s006c.htm | 02 Jun 1997 | LBT Drawing Standards |